Narryer Metals Limited
  • Home
  • Corporate
    • About
    • Directors & Management
    • Corporate Governance
  • Projects
    • Canada
      • Northwest Territories Canada
        • Big Hill Project
        • Fran Hill Project
      • NW Ontario Projects
      • James Bay Projects, Quebec
    • Western Australia
      • Rocky Gully Project
      • Pingrup Scandium Project
    • Gawler Craton, South Australia
      • Muckanippie JV
  • Investors
    • ASX Announcements
    • QUARTERLY REPORTS
    • ANNUAL REPORTS
    • In the Media
    • Right to Receive Documents
  • Contact
  • Menu Menu

Northwest Territories Canada

Overview

Figure 1: Location of Narryer Metals Limited’s Li projects in Canada

The Big Hill and Fran Projects are 70% owned by Narryer and are located in the Yellowknife Lithium Province, NWT Canada approximately 30km east of the Yellowknife township13. The projects have good access from a major road and other infrastructure (Figure 11).  During the reporting period, Narryer continued with stakeholder engagement and preparation of a mining application over the Big Hill Claims area.

The Big Hill Project (62km2) is in an area of active lithium exploration, with Li-FT Power’s (TSXV:LIFT) BIG East Lithium Project sharing a claim boundary and mineralisation along strike (Figure 12).  Li FT Power announced NI 43-101 Inferred Resources at its BIG East and BIG West Lithium Project areas, with the BIG East Lithium Project area having an Inferred Resource of 16.5 Mt @ 1.06% Li2O and the BIG West Lithium Project area having an Inferred Resource of 1.3 Mt @ 0.92% Li2O (see Li FT Power TSX-V Announcement 1 October 2024). Narryer’s Big Hill Project may potentially provide access and a development footprint for any future mining development at Li FT Power’s Big East Lithium Project.

Lithium-caesium-tantalum (LCT) pegmatites have been identified on the Big Hill mineral claims14. The channel sample assays received during the 2023 field season, include grades up to 1.16% Li2O over 5m, including 2.57% Li2O over 1m at sample site BHDS-023 and grades up to 2.43% Li2O over 1m at sample site BHRC-018. These sit proximal to the Li FT Power Big Resource area and most likely the same mineralised system. In July-August 2024 (Figure 7), further channel sampling was completed, with results along the southern boundary with the BIG East Resource of Li FT Power, from lakeside outcropping pegmatite including 1.5m @ 1.0 % Li2O (Channel 1) and 2.4m @ 1.4 % Li2O (Channel 2).15

Figure 12: Project Tenure map of Yellowknife area, showing Big Hill and Fran Projects

Figure 13. The Big Hill Project’s mineral claims showing results of recent channel sampling and adjoin the Li-FT Power’s BIG mineral lease.


13 Narryer Metals Limited ASX announcement 5 June 2024
14 Narryer Metals Limited ASX announcement 12 March 2024
15 Narryer Metals Limited ASX announcement 29 January 2025

Canada

  • Northwest Territories Canada
    • Big Hill Project
    • Fran Hill Project
  • NW Ontario Projects
  • James Bay Projects, Quebec

Western Australia

  • Rocky Gully Project
  • Pingrup Scandium Project

South Australia

  • Muckanippie JV

Narryer Metals Limited

Level 5, 191 St Georges Terrace
PERTH WA 6005

Enquiries info@narryer.com.au
Tel +61 (0)2 9299 9690

ASX NYM
ACN 651 575 898

© Copyright - Narryer Metals Limited - Website by Web and Print Design
  • Link to X
  • Link to LinkedIn
  • Disclaimer
  • Privacy Policy
  • Cookie Policy
Scroll to top Scroll to top Scroll to top